Oracle

Primavera P6 Professional Project Management

3 vulnerabilities found.

Hinweis: Diese Liste kann unvollständig sein. Daten werden ohne Gewähr im Ursprungsformat bereitgestellt.
Exploit
  • EPSS 3.54%
  • Published 21.07.2021 15:15:21
  • Last modified 21.11.2024 06:02:56

Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracl...

  • EPSS 1.67%
  • Published 08.11.2019 15:15:11
  • Last modified 07.07.2025 14:15:21

A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.

  • EPSS 6.05%
  • Published 30.10.2018 12:29:00
  • Last modified 21.11.2024 03:38:50

The OpenSSL DSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.1a (Affected 1.1.1). Fixed in OpenSSL 1.1....