- EPSS 3.19%
- Veröffentlicht 12.08.2002 04:00:00
- Zuletzt bearbeitet 16.06.2026 21:58:07
iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter.
CVE-2002-0787
- EPSS 2.88%
- Veröffentlicht 12.08.2002 04:00:00
- Zuletzt bearbeitet 16.06.2026 21:58:08
Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters.
CVE-2001-1314
- EPSS 5.28%
- Veröffentlicht 16.07.2001 04:00:00
- Zuletzt bearbeitet 16.06.2026 21:56:01
Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite.
CVE-2001-1315
- EPSS 4.34%
- Veröffentlicht 16.07.2001 04:00:00
- Zuletzt bearbeitet 16.06.2026 21:56:01
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite.